top of page

Bathrooms Done Right

Bathroom remodels

To help save space and allow for faster loading pages I am trying different ways to show my work.

This page is not finished, each project has a link to the step by step process. Thank you for looking! 

Click pictures to enlarge

1) Master Bath Remodel

This bathroom had a shower but no tub, with a large cabinet next to the shower that would never be fully utilized for just towels, there had never had a tub so there was no existing plumbing. The concrete had to be cut and hammered up to run a drain. Took the partition wall down to a half wall and I ordered the glass and did the install. 

Bathroom remodel, start to finish
bathroom remodel, start to finish
bathroom remodel start to finish

2) Small bathroom remodel

I took out a pink cast iron bathtub and yellow acrylic tub surround, the 

floor tile and vanity. Then I installed a mortar shpwer pan and tiled walk in shower with frameless shower doors, a new floor and vanity, scraped the popcorn ceiling, re-textured, installed crown molding then painted the whole thing. It turned out pretty sharp!

Shower remodel
Bathtub removal
Walk in tile shower installation
DSCN0352.JPG
DSCN0353.JPG

More to come soon

4) Tiled walk-in shower with fiberglass shower pan

This shower has no door, just a glass partition wall. This was part of a remodel that included the entire home.

Walk in shower pan bathroom remodel
walk in shower bathroom remodel

HOME      Contact Me

bottom of page